Maintaining your Assets

Our team are experts in technical asset management. Our comprehensive service is designed to optimise the performance and value of your property portfolio through its entire life cycle. We will work with you to meet statutory and legislative obligations whilst identifying opportunities for operational and energy efficiency improvements. We look to minimise operational risk, optimise asset performance and help meet sustainability goals so you can focus on operating your portfolio to its fullest potential. 

Two men stand on an outdoor staircase. They are both wearing hard hats and high vis jackets. They are in discussion, looking over a folder with sheets of paper.

AUDIT REPORTING


Using EDGE APM software, we produce a comprehensive reporting framework for multiple assets and contractors associated with a building. These audits have three purposes:

  • To review contractor performance related to the maintenance of MEP services.
  • To assess the condition of plant rooms, signage, and storage of equipment, and review the condition and operational performance of assets. 
  • To briefly review operational and energy efficiency and identify opportunities to improve upon this. 


Informed by site visits and detailed scrutiny of contract-related documentation, our audit reports use a Red Amber Green (RAG) rating system to identify the timescale for and urgency of remedial action or improvement. Audits are critical for ensuring occupant safety, legal compliance, and ensure your contractors are satisfying their contractual and legal responsibilities. 


We can also produce a tailored Managing Agent report that will capture top-level information to inform portfolio level actions. 

PLANNED MAINTENANCE REPORTS (PMR)


A robust and accurate PMR (sometimes called a Planned Maintenance Programme or PMP) is the key to any successful asset management strategy that combines ambition with cost efficiency. The report details the life-cycle costs of existing assets – such as the need for repair or like-for-like replacement based on age and condition – within a set time frame, usually a 10-year period. 


Developed in accordance with CIBSE Guide M, a PMR allows you to predict with accuracy when MEP assets will require replacement or repair, enabling you to forecast future expenditure and recoup costs through service charges. 


Resero is able to prepare, audit, and monitor PMRs. We use our own cost library detailing real and recent project costs to help improve accuracy. Our RICS NRM and BESA SFG20 aligned asset registers provide industry recognised formats for both surveyors and engineers.


AN ALTERNATIVE PMR


Our Alternative PMR is usually prepared with a sustainability target in mind, such as net-zero carbon or an improved EPC rating. We prepare the cost plan to ensure it utilises the existing replacement timetable wherever possible and clearly identifies those costs that may not be service charge recoverable (or will need advice) as well as predicted energy savings and payback periods.


This prevents double counting of costs. Using the counterfactual of existing costs, it finds the most cost-effective method and timetable to achieve a target. It also helps asset managers to understand and report on climate change related financial risk.

DISCOVER

PLANNED MAINTENANCE REPORTS (PMR)


A robust and accurate PMR (sometimes called a Planned Maintenance Programme or PMP) is the key to any successful asset management strategy that combines ambition with cost efficiency. The report details the life-cycle costs of existing assets – such as the need for repair or like-for-like replacement based on age and condition – within a set time frame, usually a 10-year period. 


Developed in accordance with CIBSE Guide M, a PMR allows you to predict with accuracy when MEP assets will require replacement or repair, enabling you to forecast future expenditure and recoup costs through service charges. 


Resero is able to prepare, audit, and monitor PMRs. We use our own cost library detailing real and recent project costs to help improve accuracy. Our RICS NRM and BESA SFG20 aligned asset registers provide industry recognised formats for both surveyors and engineers.


AN ALTERNATIVE PMR


Our Alternative PMR is usually prepared with a sustainability target in mind such as net-zero carbon or an improved EPC rating. We prepare the cost plan to ensure it utilises the existing replacement timetable wherever possible and clearly identifies those costs that may not be service charge recoverable (or will need advice) as well as predicted energy savings and payback periods.


This prevents double-counting of costs. Using the counter-factual of existing costs it finds the most cost-effective method and timetable to achieve a target. It also helps asset managers to understand and report on climate change related financial risk.

DISCOVER
A man wearing a shirt looks at two computer screens. One is showing a list of files, while the other shows a digital model of a building.

MONITORING + IMPROVING OPERATIONAL ENERGY


Reviewing ongoing operational energy data is a core part of our asset management role. Accurate data is the key to improving operational performance and reducing cost, which means our first step is always to interrogate and validate existing energy data.  We also look at the operational effectiveness of all building systems. Significant energy savings can be made by confirming all systems are commissioned, optimised, and maintained properly.


We then combine a number of datasets to run benchmarking and analysis  through our software. This allows us to create an energy strategy using a digital model of the building, which can also help us to understand the impact of any proposed changes. If engaged on a framework, we oversee the implementation and review of such energy strategies through periodical audits and site visits. Our tailored software solutions mean we take ongoing responsibility for the quality of our recommendations and the impact we are achieving.

CATEGORY A + B FIT OUTS


In a multi-let environment, it is crucial to ensure that any works undertaken do not adversely impact occupant or landlord interests. 


At Resero, we can advise you on tenant requirements when planning Category A building works to ensure the interests of building occupants are taken into consideration. Similarly, where tenants plan Category B fit outs, we can issue a tracker document to review the scope of proposed works and ensure consideration is given to critical elements of building safety and existing MEP services like fire stopping and equipotential bonding. These are often appended to the Landlord Tenant Agreement (LTA) and inform interim or terminal schedules of dilapidations.


Another key element of both Cat A and B works is to ensure that any significant changes to the MEP services do not impact the overall EPC rating. Resero can review planned works and advise you on how to reduce their impact on energy efficiency. As part of our management framework, Resero would normally have created a dynamic simulation model as a prerequisite for planning a net zero carbon strategy, this model can be updated with the proposed works and a predictive EPC generated.

a group of people are sitting at desks in an office

RELATED SERVICES


Find out more about the services we offer.

SERVICES IN ACTION


Find out more about the value of technical asset management.

RESOURCES + INSIGHTS


All the latest news and expertise from the Resero team.

By Alan Christie 20 Sep, 2024
In the dynamic landscape of UK commercial real estate, effective technical asset management is the cornerstone of success. However, even seasoned professionals can fall victim to common pitfalls that undermine portfolio performance. At Resero, we've identified five key areas where mistakes frequently occur: Regulatory Compliance, Risk Management, Decarbonisation, Strategy, and Operational Efficiency. Let's explore these areas and discuss how to avoid potential missteps. 1. REGULATORY COMPLIANCE MISTAKES The UK's regulatory landscape is constantly evolving, particularly in the wake of Brexit and increasing focus on building safety. Common mistakes include: Overlooking changing regulations: Many asset/building managers fail to stay abreast of new legislation, such as the SFG20 compliance standards, the Building Safety Act 2022, and risks associated with the trajectory for the Minimum Energy Efficiency Standards (MEES). Failing to maintain proper documentation: Incomplete or disorganised records can lead to compliance issues and potential fines. How to avoid: Implement a robust compliance management system, conduct regular audits, and consider appointing a dedicated compliance officer. Stay informed through industry bodies like the British Property Federation and RICS. 2. risk management oversights In an uncertain economic climate, risk management is more crucial than ever. Typical errors include: Underestimating potential threats: Failing to account for risks such as market volatility, interest rate changes, or unforeseen events like the COVID-19 pandemic. Lack of comprehensive risk assessment: Focusing solely on financial risks while neglecting operational or reputational risks. How to avoid: Conduct regular, comprehensive risk assessments. Develop scenario planning exercises and implement robust risk management strategies that cover all aspects of your portfolio. 3. DECARBONISATION PITFALLS With the UK government's commitment to net-zero emissions by 2050, decarbonisation is no longer optional. Common mistakes include: Ignoring sustainability/net zero trends: Failing to recognise the growing importance of Environmental, Social and Governance (ESG) criteria to investors and tenants. Short-term thinking in energy efficiency: Opting for quick fixes rather than long-term sustainable solutions. How to avoid: Set clear sustainability goals aligned with the UK's net-zero target. Invest in green technologies and conduct regular energy audits. Consider certifications like BREEAM to demonstrate your commitment to sustainability. 4. STRATEGIC MISSTEPS A well-defined strategy is essential for long-term success. Frequent errors include: Lack of clear long-term vision: Focusing on short-term gains at the expense of long-term value creation. Failure to align technical asset management with business objectives: Operating in silos rather than integrating technical asset management with overall business strategy. How to avoid: Develop a comprehensive technical asset management strategy that aligns with your organisation's goals. Conduct regular strategy reviews and ensure stakeholder engagement across all levels of your organisation. 5. OPERATIONAL EFFICIENCY BLUNDERS In the competitive UK market, operational efficiency can make or break your portfolio's performance. Common mistakes include: Neglecting preventative maintenance: Reactive approaches to maintenance often lead to higher costs and disruptions. Resistance to new technologies: Failing to adopt PropTech solutions that could streamline operations and improve tenant experience. How to avoid: Implement predictive maintenance programmes, embrace innovative PropTech solutions, and focus on continuous process improvement. Consider tools like smart building systems to enhance operational efficiency.
By Georgia Tierney 11 Jul, 2024
At Resero, we believe in the power of fostering new talent and perspectives within our industry. Our "grow-our-own" approach is designed to bring in fresh ideas and innovative solutions by nurturing young professionals. By providing them with the right tools, training, and opportunities, we aim to create a dynamic and forward-thinking workforce capable of tackling the challenges of sustainable energy and building design. Energy Engineer, Georgia Tierney guides us through her experience joining Resero straight out of University: From Work Placement to Energy Engineer: Georgia’s Story My journey with Resero began in 2022, sparked by a lecture given by Non-Executive Director , Andrew Cooper that aligned perfectly with my postgraduate dissertation. After reaching out to Andrew with a list of questions, what started as a simple enquiry quickly transformed into a work placement opportunity. During my first few weeks at Resero, I immersed myself in learning how to use software to create digital twins, build models, and understand the practical applications of the recommendations made towards asset improvement. It was during this time that I was put through the One-Click LCA Summer School to help me gain first-hand experience in crafting a Life Cycle Assessment (LCA). The hands-on experience was invaluable, and within three months, I was thrilled to receive an offer for a full-time position to join the Net Zero Carbon (NZC) Design team as a Junior Energy Engineer, to begin as soon as I completed my master’s degree in Medical Radiation Physics. Since joining the team permanently, my learning and development has continued at a rapid pace. Some of the key training programs and courses I’ve completed include:
By Joe Treanor 21 Mar, 2024
By their very nature ‘fugitive’ emissions can, at best, only be estimated during the design stage of an embodied carbon report, often called a Life Cycle Assessment (LCA). A LCA is a method of evaluating the environmental burden of processes and products during their life cycle from cradle to grave . Post installation record keeping of fugitive emissions can inform subsequent reviews, and reporting. Giving exaggerated importance to estimated fugitive emissions may compromise the selection of air conditioning equipment that is demonstrably more suitable for the application, and in many cases more energy efficient than the alternatives. What are fugitive emissions? Fugitive emissions refer to the gases or vapours that are released from pressurised equipment due to leaks, evaporation, or other unintended or irregular releases. In the context of refrigerant gas within air conditioning systems, fugitive emissions refer to the leakage of refrigerant gases into the atmosphere. Refrigerant gases are commonly used in air conditioning/heat pump systems as part of the mechanical cooling/heating cycle. Refrigerant gases may escape from the system due to various reasons such as equipment failure, poor installation, neglect during maintenance, and as part of final decommissioning. Fugitive emissions are rightly a concern, many refrigerants are potent greenhouse gases. For example, commonly used refrigerants like hydrofluorocarbons (HFCs) have a much higher global warming potential than carbon dioxide. Even small amounts can contribute significantly to global warming. How does the sector mitigate against fugitive emissions? It is not only good practice to mitigate against fugitive emissions refrigerant handling is also covered by several UK regulations and standards: The Fluorinated Greenhouse Gases Regulations 2015: This regulation implements the EU F-Gas Regulation in the UK, which aims to reduce emissions of fluorinated greenhouse gases (F-gases), including HFCs used as refrigerants. It requires companies that produce, supply, use, install, service, maintain or dispose of equipment containing F-gases to hold a company certificate issued by an approved certification body. Individuals carrying out these activities must also hold a qualification recognised by the Environment Agency. The Ozone-Depleting Substances Regulations 2015: This regulation implements the EU ODS Regulation in the UK, which aims to protect the ozone layer by controlling the production, supply, import, export, ownership, and use of ozone-depleting substances (ODS), including certain refrigerants. It requires companies that carry out these activities to hold a company certificate issued by an approved certification body. The Health and Safety at Work Act 1974: This act requires employers to ensure the health and safety of their employees and others who may be affected by their activities. This includes ensuring that refrigerants are handled safely. The Control of Substances Hazardous to Health Regulations 2002 (COSHH) : These regulations require employers to assess the risks from hazardous substances, including refrigerants, and take appropriate measures to prevent or control exposure. British Standard BS EN 378: This standard specifies safety and environmental requirements in relation to the design, manufacture, installation, operation, maintenance and disposal of refrigerating systems and heat pumps. F-Gas Certification: Technicians who install, maintain or service stationary refrigeration equipment containing F-gases must hold a valid F-gas certificate issued by an approved certification body. Waste Management: The Environmental Protection Act 1990 and the Hazardous Waste Regulations 2005 require businesses to ensure that waste refrigerants are disposed of safely and responsibly. The legislation above illustrates that prevention of fugitive emissions is something that the industry is focused on and that the loss of refrigerant, other than through exceptional circumstances, is entirely preventable. Failure to comply with the applicable regulations can result in significant fines for responsible parties (beyond engineers and contractors). Therefore, it's crucial for landlords and building managers to ensure that the handling of refrigerants is done responsibly and in accordance with the law. The importance of Technical Asset Management in this regard should not be underestimated, site auditing is key to responsible building management, read more here . Including fugitive emissions within LCA reporting LCAs assess the environmental performance of a building and the outputs have numerous environmental indicators but are often collectively referred to as the amount of Carbon Dioxide equivalent (CO2e) emitted during the manufacture, transport, and construction of building materials, together with end-of-life emissions. BS EN 15978-1 provides a calculation methodology for the assessment of environmental performance of buildings. Whilst it is normal practice to include fugitive emissions within LCA reporting, it is also good practice that the reader is given guidance on their relevance, and importance, in understanding the buildings overall total environmental impact. Diligence should be taken to source manufacturers data, as an example, Daikin¹ recommend the following percentages for embedded carbon reporting: Refrigerant Recovery Efficiency = 99% Annual leakage rate = 2% of refrigerant charge Annual purge release factor = 0% Annual service release = 0% Probability factor for catastrophic failure = 0.001% This information confirms that: During refrigerant recovery, at end-of-life or because of repairs, gas lost is considered minimal and is associated with residual amounts (service engineers gauge lines). Industry studies show that correctly installed systems are not prone to refrigerant leaks. VRV systems do not require any purging of refrigerant, plus refrigerant purging is not permissible under UK and EU regulation. VRV leak checking as part of annual servicing can be done without ‘opening’ the refrigerant side of the system. Interestingly, Daikin Industries have carried out a study that shows that catastrophic failures on systems occur 1 in every 10,000 systems, there recommended 1 in every 1000 is a very conservative figure. In conclusion the reporting of fugitive emissions should be done with care, and reports should include explanatory notes. There are many factors when considering equipment selection, whilst embodied carbon is one of them it should form part of a holistic approach. A whole life carbon assessment (WLCA) standard can estimate the amount of carbon emitted throughout the life cycle of a constructed asset, from the early stages of development though to the end of life. It gives visibility to embodied carbon, operational carbon, and user carbon. Sources ¹ Daikin Pol01 BREEAM Calculation Default Values
By Neil Dady 06 Mar, 2024
The Technical Asset Management team at Resero oversees many areas, but at the heart of what we do is risk management. Our market-leading site audits are supported by tailored software that ensures consistent reporting whilst mitigating landlord risk. What is building statutory compliance in the UK?  Statutory compliance in non-domestic properties refers to the legal requirement for commercial buildings to adhere to certain laws, regulations, and standards. This is crucial in ensuring the safety, health, and welfare of the people who use these buildings and that the building complies with environmental regulations. Non-compliance can pose significant risks to insurance policies, the value of the property and of course the occupants’ health and wellbeing. The role of statutory compliance in non-domestic properties is multifaceted and includes the following:
By Alan Christie 04 Mar, 2024
If you're a tenant planning to make changes to your leasehold property, or a facilities manager of a multi-let property, it's crucial to understand the concept of License to Alter (LTA) and the importance of obtaining specialist M&E advice when approving tenant requests. In this technical guidance note, we delve into the significance of LTAs and why seeking specialist consultancy advice is paramount before proceeding with any alterations.  What is a License to Alter (LTA)? A License to Alter is an agreement between a tenant and a landlord granting permission for the tenant to carry out works on a leasehold property. It sets out the conditions under which the alterations may be carried out and ensures that no unexpected conflicts will arise as a result of the work. This agreement, held alongside the lease document, serves as a framework for future actions related to the property, including terminal schedules of dilapidations. Why is it important to seek specialist consultancy advice before approving an LTA? Facilities Managers play a pivotal role in ensuring tenants are accommodated while safeguarding the property's integrity. While it's essential to allow for and facilitate tenant alterations, it's equally important to mitigate any adverse impacts on other occupants, landlord services, and the property's Energy Performance Certificate (EPC) . Any works that involve electrical, or mechanical infrastructural changes should be approved through an LTA. The temptation might be to ‘save cost’ by reviewing the works without reference to an M&E specialist but the liability of risk will then fall upon the facilities management team if an issue arises later. Below we list some practical examples of why the LTA process requires an M&E consultant’s review.
a large stainless steel water tank with a ladder attached to it
By Joe Gubats 01 Mar, 2024
In this blog our Projects Director, Joe Gubats, talks through some the latest legislation for maintaining sprinkler water tanks.  The lifespan of a sprinkler tank depends on various factors, in particular the quality of maintenance. On average a well-maintained sprinkler tank could last up to 30 years or more. The frequency of inspection depends on several factors, including, but not limited to, the size of the tank, its location, the type of water source, and of course, the type of sprinkler system installed. The LPC Sprinkler Rules for Automatic Sprinkler Installations is a comprehensive set of guidelines and standards that govern the design, installation, and maintenance of automatic sprinkler systems in the United Kingdom. This standard incorporates the full BS EN 12845:2015+A1:2019 standard, this is a European standard that specifies the requirements and methods for the design, installation, and maintenance of fixed firefighting systems. The LPC Sprinkler Rules are updated regularly with new Technical Bulletins to ensure they reflect the latest best practices and technological advancements in the field of fire protection. These bulletins provide detailed guidance on specific aspects of sprinkler system design and installation, such as pipe sizing, pump selection, water supply requirements, and system testing procedures. In addition to these technical requirements, the LPC Sprinkler Rules also include provisions for quality assurance and documentation. For example, they require that all work be carried out by competent personnel and that detailed records be kept of all system design calculations, installation work, and maintenance activities. By adhering to these rules and bulletins, building owners and operators can ensure that their sprinkler systems can provide effective fire protection. Moreover, compliance with these standards can also help to satisfy legal requirements and insurance conditions related to fire safety. Resero's Technical Asset Management audits ensure that statutory requirements are met and that detailed records are being kept. The Loss Prevention Certification Board (LPCB) updated its Technical Bulletin 203 (TB203), which outlines the care and maintenance requirements for automatic sprinkler systems. Published in September 2022, this bulletin now mandates a fully detailed 'Inspection/Condition Report' as part of the two-yearly routine, also known as the TB203 2-year inspection. Download a copy here . The Inspection/Condition Report is a comprehensive document that provides an in-depth assessment of the condition of the automatic sprinkler system. It is designed to ensure that the system is functioning correctly and efficiently, and that it meets all relevant safety standards and regulations. The report should include a thorough examination of all components of the sprinkler system, including but not limited to: Sprinkler heads: These should be checked for any signs of damage, corrosion, or obstruction that could prevent them from operating correctly. Piping: The pipes should be inspected for any signs of leakage, corrosion, or other damage. The report should also confirm that the pipes are correctly sized and installed. Control valves: These should be checked to ensure they are in the correct position and functioning properly. Water supply: The report should confirm that there is an adequate water supply for the sprinkler system, and that the pressure is sufficient. Alarm devices: These should be tested to ensure they are working correctly. Fire pumps: If present, these should be inspected and tested to confirm they are operating correctly. Records: The report should include a review of the maintenance records for the sprinkler system, to confirm that all necessary maintenance has been carried out. In addition to these specific checks, the Inspection/Condition Report should also include a general assessment of the overall condition of the sprinkler system, and any recommendations for repairs or improvements. The introduction of this requirement reflects the LPCB's commitment to ensuring that automatic sprinkler systems are maintained to the highest possible standard, in order to provide effective fire protection. It is therefore essential that all those involved in the commercial building industry are aware of this requirement and take steps to comply with it.